HomeMy WebLinkAboutHVAC Y8-2030-0707
)
~
OJHKQIH
ON THE WATER
City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903-1130
www.ci.oshkosh.wi.us
July 20, 2007
Karen Casey
Gustave A Larson Company
680 Hickory Farm Lane
Appleton, WI 54914
Jack Schloesser
P.O. Box 2443
Oshkosh, WI 54903
Site:
O.B.C. Graphics
555 W WaukauAve
Oshkosh WI 54902
For:
Description: HVAC alterations
Object Type: HV AC only'
<:;1assof Construction: IIIB - 3618 Sq Ft
Occupancy: F: Factory /Industrial
Plan Number: Y8-2030-0707
The submittal described above has belm reviewed for conformance with' applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defmed in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Item(s) / Conditions:
. IMC 304.1 Equipment and ap,pliances shall be installed as required by the terms of their approval, in
accor.dance with the conditions of the listing, the manufacture's instructions and this code.
. 304.8 Clearances from grade. Equipment and appliances installed at grade level shall be supported on a
level concrete slab or other approved material extending above adjoining grade or shall be suspended a
minimum of 6 inches (152 mni)above adjoining grade.
. '. NEC 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be
provided and maintained about all electric equipment to permit ready and safe operation and maintenance
of such equipment. Verify that the appropriate clearances required by this section are being maintained
. IBC 1l01.2/ANSI A1l7.1-308.2 & 3 - Mechanical system controls shall be located a maximum.of48"
above the finished floor if the floor space allows a forward approach by a wheel chair orifthe clear space
allows a parallel approach.
. Com1l161.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
rules under this code and which are made to construction documents that.have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. All revisions and, modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm6L31(1).
I:\IJJsp(;dions'.Plan
Pi:m Revi",,,,, 2001'.'\.'8-20:\0-0707555 W WaubuAve IIVAC Only.(kK:
Page 1 of2
SUBMIT:
. IECC 503.3.3.7 [Comm 63.0503(2)(1)] Balancing and documentation of the HV AC system shall conform
to the IMC. Balancing report required to be submitted prior to final occupancy being allowed. Balancing
report is required to reflect revised outside air requirements shown in the revisions submitted on July
2(/h.
. Comm 61.50 (4) Supervisio~. 'Prior to the initial occlipancy of an alteration the supervising professional
shall file a compliance statement form SBD-9720 with this office.
A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh InSpection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
ria oe
Building Systems Consultant
(920) 236-5051 Monday- Friday 7:30 AM. to 8:30 AM and 12:30 AM to 1:30 P.M.
bnoe@ci.oshkosh.wi.tis .
cc: Property file
Fee Required $
Fee Received $
Balance Due $
300.00
300.00
0.00
,
Fji'l~pe...iii.lns\Phm Review\Commercial PI;m Rt'vit'W 2007\Y8-2030-0707 555 W Wauk:m .Ave nVAC Onlydne
.I .
Page 2 of2