Loading...
HomeMy WebLinkAbout0125913-Building (sprinkler system) o OSHKOSH ON THE WATER Job Address 3530 OMNI DR CITY OF OSHKOSH No 125913 BUILDING PERMIT - APPLICATION AND RECORD Owner OMNI GLASS & PAINT INC Create Date 12/06/2006 Designer Contractor AHERN FIRE PROTECTION Category 209 - New Industrial Plan W6-115-1206-F Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Bedrooms Stories Signs Garage Baths Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Not Required # Dwelling Units o # Structures o Park Dedication Use/Nature INew Office/Shop -Sprinkler System installation for new 2 Story Office (14,215 sf), 1 story shop/production/warehouse (52,417 sf with of Work 2400 sf mezzanine). HV AC Contractor Plumbing Contractor Electric Contractor $76,000.00 Plan Approval $0.00 Permit Fee Paid $316.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 07/23/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1278000000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Fond du Lac Address 201 Morris Court WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.