HomeMy WebLinkAbout0125922-Building (Four seasons room)
G
OSHKOSH
ON THE WATER
Job Address 1628 MICHIGAN ST
CITY OF OSHKOSH No 125922
BUILDING PERMIT - APPLICATION AND RECORD
Owner DANIEL R1LORI A HENDERSON Create Date 07/23/2007
Designer
Contractor ALAN LEE CONSTRUCTION
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Signs
Garage
Sq.Ft.
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
o
# Structures
o
# Dwelling Units
Use/Nature ~FRI Gutting the existing side 4 seasons room due to water damage. Installing new insulation and drywall. The roof will have spray foam
of Work installed for the entire cavity to avoid venting the roof.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: valuation~
Issued By: ~
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
$5,100.00 Plan Approval
Date 07/23/2007
Final/D.P. 00/00/0000
o Permit Voided I
Parcel Id # 0908440000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
deSCribe\~his permit application within an easement, the City strongly urges the permit applicant to contact the e~a.s..emen..t
hOlder(s(i\ to se any necessary, pprovals before starting such activity.
Signature .. ,at . -7-cJ3-Q 7
Agent/Owner
Address 861 FLORIDA AVE
OSHKOSH
WI 54902 - 0000
Telephone Number
233-3581
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Acc,ass into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.