Loading...
HomeMy WebLinkAboutPlumbing Y2-256-0707-P City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX July 20, 2007 Tower Mechanical Services 2125 W. 20th Ave. Oshk sh, WI 54902 Ref: lumbing Plan Approval: Chiemsee Castle Day Care 4055 State Rd 91, Oshkosh, WI Plan 10# Y2-256-0707-P Dear Sirs, Exa ination of the plumbing plans and specifications for this project has been completed. In acco d with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon com Iiance with the stipulation(s) noted below. 1. Circulated hot water distribution lines shall be insulated for maximum BTU heat loss per COMM 82.40 2. Water distribution lines shall be sized per COMM 82.40 based on an "A" value of 30 3. Sanitary vent sizing will restrict 1 %" pipe to service no more than two water closet fixtures per COMM 82.31 4. Building sewer shall be accessible through c1eanout per COMM 82.35 In th event installation of this plumbing system has not commenced within two years from this date this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In gr nting this approval, the City of Oshkosh or its representative does not hold itself liable for any efects in plans or specifications, plan omissions, examination oversight, construction or any amage that may result in or after installation. The City of Oshkosh reserves the right to orde changes or additions should conditions arise making this necessary. It sh II be necessary for the installing plumber to obtain a plumbing permit from the City of Osh osh before proceeding with actual installation of this plumbing system or any of its parts. Respectfu lIy, Richard Wood, Plumbing Inspector