HomeMy WebLinkAbout0125893-Building (driveway)
e
OSHKOS
ON THE WATE
Job Address 854 N MAl N ST
CITY OF OSHKOSH
No
125893
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES E/BEVERL Y J MCCARTHY
Create Date 07/20/2007
Designer
Category 56 - Parking Lots, Driveways
Type Building o Sign
Zoning
Sq.Ft.
Finished/Livin Sq. Ft.
Garage Sq.Ft.
Foundation Poured Concrete o Floating Slab
Concrete Block o Post
Contractor
OWNER
Plan
o Canopy
o Fence
o Raze
Class of Const:
Size
Rooms
Height
Ft.
D Projection I
Bedrooms
Stories
Canopies
Baths Signs
o Pier 0 Other
o Treated Wood
Occupancy Pe mit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedicatio
# Dwelling Units
o
# Structures
o
Use/Nature
of Work
FRI Replace concrete driveway' The driveway will be the same size as the existing driveway. Work was done by Affordable Concrete.
HVAC Contrac or
Plumbing Contractor
Electric Contr ctor
Fees: Valuati n
$4,500.00 Plan Approval
$0.00 Permit Fee Paid
$53.00 Park Dedication
$0.00
Issued By:
Date 07/20/2007
Final/O.P. 00100/0000
D Permit Voided I
Parcelld # 1503740000
In the pe ormance of this work I agree to perform all work pursuant to rules governing the described construction.
While th City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
describe in this PC, ,t, pplication wi,thin an easement, the City strongly urges the permit applicant to contact the easement
holder(s) nd to s cure ,~ny nece a ap rovals before starting such activity.
Signatur ) ,,-;," '" Date ,><::::::,/1( ..4J,.....1' '7
/ . 'AgenUOwner (
Address 1UMAI~ ST OSHKOSH WI 54901 - 2322 Telephone Number
To sche ule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspecti n (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.