HomeMy WebLinkAbout0125843-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 327 W SOUTH PARK AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 125843
Owner TIMOTHY P/ERIKA V MULVEY
Create Date 07/17/2007
Category 411 - Residential-Water Heaters
Contractor SAMMONS PLUMBING
Bathtub Shower Water Softner
Whirlpool Floor Drain Local Waste
Lavatory Lndry Tray Clothes Wshr
Toilet Disposal Bidet
Res. Sink Dishwasher Beer Tap
Bar Sink Sump Pump Lab Sink
Water Heater Classrm Sink Sterilizer
Site Drain Breakrm Sink Dip Well
Roof Drain Ejector/Grind Drink Ftn
Misc.
Fixtures
Use/Nature SFR / Replace gas water heater. "DEBIT ACCT".
of Work
Plan
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
Type
#
Conn. Type
Valuation
$600.00 Plan Approval
ar-JiXi
$0.00
Parcel Id #
0904190000
Issued By
Permit Fees
$25.00 0 Permit Voided I
Date 07/18/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH
Date
WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.