Loading...
HomeMy WebLinkAbout0125843-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 327 W SOUTH PARK AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 125843 Owner TIMOTHY P/ERIKA V MULVEY Create Date 07/17/2007 Category 411 - Residential-Water Heaters Contractor SAMMONS PLUMBING Bathtub Shower Water Softner Whirlpool Floor Drain Local Waste Lavatory Lndry Tray Clothes Wshr Toilet Disposal Bidet Res. Sink Dishwasher Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. Fixtures Use/Nature SFR / Replace gas water heater. "DEBIT ACCT". of Work Plan Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Sanitary Sewer Storm Sewer Water Service Material Type # Conn. Type Valuation $600.00 Plan Approval ar-JiXi $0.00 Parcel Id # 0904190000 Issued By Permit Fees $25.00 0 Permit Voided I Date 07/18/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH Date WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.