HomeMy WebLinkAbout0125859-Building
e
OSHKOSH
ON THE WATER
Job Address 902 EASTMAN ST
CITY OF OSHKOSH No 125859
BUILDING PERMIT - APPLICATION AND RECORD
Owner HV PROPERTIES LLC Create Date 07/18/2007
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature rSFRI LATE PERMITI Gutting the bathroom and installing new drywall, cabinets, exhaust fan. The kitchen cabinets are also being
of Work replaced (same layout, no walls opened).
HVAC Contractor Plumbing Contractor
Electric Contractor UNKNOWN????
Fees: Valuation
Issued By: l'lt-
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$125.00 Park Dedication
$0.00
Date 07/18/2007
FinaI/O.P. 0010010000
D Permit Voided I
Parcelld # 1002850100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approval efore starting such activity.
Signature ~~ Dat~ 7//(f(cJ?
Agent/Owner
Address PO BOX 2833
APPLETON
WI 54912 - 2833 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.