Loading...
HomeMy WebLinkAbout0125847-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 1235 W 11TH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner PAMELA A YOUNGWIRTH Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well . F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures UselNature SFR 1 Replace gas water heater. ""DEBIT ACCT*". of Work No 125847 Create Date 07/17/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Conn. Type # Material Type Sanitary Sewer Storm Sewer Water Service Valuation $600.00 Plan Approval ~ $0.00 $25.00 0 Permit Voided I Permit Fees Issued By Parcel Id # 1308210000 Date 07/18/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.