Loading...
HomeMy WebLinkAbout0125827-Building (Renew #101061) e OSHKOSH ON THE WATER Job Address 520 OAK ST CITY OF OSHKOSH No 125827 BUILDING PERMIT - APPLICATION AND RECORD Owner MARY P PHIPPS Create Date 07/17/2007 Designer Contractor OWNER Category 111 - Single Family Addition Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR/ Renewing permit #101061 to finish single story addition and remodel of existing house. All work shall comply with applicable of Work building codes. Work is still needed in the kitchen and bathroom and a pellet stove will be installed. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 07/17/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1103640000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessa pprovals b13fore starting such activity. Signature AgenVOwner OSHKOSH Date y1-/7'-O Address 520 OAK ST WI 54901 - 4621 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.