HomeMy WebLinkAbout0125825-Plumbing (Renew #105587)
e
OSHKOSH
ON THE WATER
Job Address 520 OAK ST
Contractor OWNER
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
CITY OF OSHKOSH
No
125825
PLUMBING PERMIT. APPLICATION AND RECORD
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Gri nd
Owner' MARY P PHIPPS Create Date 07/1712007
Category 410 - Residential-Interior Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
SFRI Renewing permit #105587 for the single story addition and remodel of existing house.
Size Material Type. # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1103640000
Plan Approval
$0.00
$28.00 0 Permit Voided I
Issued By
$1,000.00
~
Date 07/17/2007
Valuation
Permit Fees
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hO~~)~.n_d to secure any necessary approvals _before starting such activity. ~
s,gnatu",'P l1uO f~J Dalet' -.7-/7--07
AgenUOwner
Address 520 OAK ST OSHKOSH WI 54901 - 4621 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.