Loading...
HomeMy WebLinkAbout0125818-Building (raze duplex) e OSHKOSH ON THE WATER Job Address 520 BROAD ST CITY OF OSHKOSH No 125818 BUILDING PERMIT - APPLICATION AND RECORD Own~r BOYS AND GIRLS CLUB OF OSHKOSH wise Create Date 07/17/2007 Contractor BEAVER WRECKING Designer Category 161 - Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Bedrooms Stories 2 Signs Garage Baths Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units 2 # Structures 2 Park Dedication Use/Nature Raze 2 Story Duplex and Detached Garage. of Work Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuatio $4,000.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: Date 07/17/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 0404930000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an ease ent, the City strongly urges the permit applicant to contact the easement holder(s) and to sec ny l)eC.ess~ag rovals fore starting ruch activity. Signature f( Date 1- )7- 6 7 Agent/Owner Address W 8031 HWY 33 BEAVER DAM WI 53916 - 0000 Telephone Number 887-7030 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access intp Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.