Loading...
HomeMy WebLinkAbout2007-Building e OSHKOSH ON THE WATER Job Address 3285 S WASHBURN ST CITY OF OSHKOSH No 125798 BUILDING PERMIT - APPLICATION AND RECORD Owner BERGSTROM FOX VALLEY INC Create Date 07/11/2007 Designer Gries Architecural Contractor MIRON CONSTRUCTION CO INC Category 232 - Alteration Stores & Customer Service Plan Y7 -2026-0607 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: VB Size Finished/Living Sq.Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. o Projection: Canopies Unfinished/Basement Bedrooms Stories Garage Baths Signs Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Not Required # Dwelling Units. o # Structures o Park Dedication Use/Nature uto Sales - Miscellaneous interior remodel and new facade. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $0.00 Permit Fee Paid $2,788.00 Park Dedication $0.00 $900,000.00 Plan Approval Issued By: cw Date 07/16/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1365010000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~ Vtlt.l.t!- ;;jot./l..d-rJ:n'1 Date oX "7- J[,~O/ Ugentlowner PO BOX 509 NEENAH WI 54957 - 0509 Telephone Number 920-969-7053 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.