HomeMy WebLinkAbout2007-Building (remodel prep)
e
OSHKOSH
ON THE WATER
Job Address 1404 S MAIN ST
CITY OF OSHKOSH No 125800
BUILDING PERMIT - APPLICATION AND RECORD
Owner KEPlAR llC Create Date 07/12/2007
Designer
Contractor
BAYLAND BUilDINGS INC
Category
211 - Alteration Industrial
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
U nfin ished/Basement
Sq.Ft.
Sq. Ft.
Rooms
Height Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq. Ft.
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature Industrial/Interior demolition of walls and doors in preparation for remodel. No work in association with the remodel or with new exterior
of Work [window & door openings is to commence until otherwise approved and Permitted.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
$15,000.00 Plan Approval
$0.00 Permit Fee Paid
$118.00 Park Dedication
$0.00
Date 07/16/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0304740000
In the performance of this work I agree to perform II work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority t nforce easement restrictions of which it is not a party, if you perform the work
described in this permit a Iication with' an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ny ne provals before sta~!".JUch activit}'.
~~~ ~ Date ? - ~b'--a7
Agent/Owner
Address PO BOX 13571
GREEN BAY
WI 54307 - 3571 Telephone Number 920-498-9300
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.