HomeMy WebLinkAbout0125748-Building (exterior remodel)
e
OSHKOSH
ON THE WATER
Job Address 606 FRANKLIN ST
CITY OF OSHKOSH
No
125748
BUILDING PERMIT - APPLICATION AND RECORD
';,.-.,",,:' "
Owner -ROBERTH/DONNAJ HAVEMANN
Create Date 07/11/2007
Designer
Contractor
b F~nce -
" 0 Raze
CilteQ(1)'
Type
. Building
o Sign
() Canopy
.,;,
<"', .
Zoning
Class of Const:
Size
U flfinished/Basement
Sq.Ft.
_ Sq~ ft.,
Sq. Ft.
Rooms
Height
Ft.
o Projection I
E_ini~hed/Living
Garage
)-
Bedrooms
'i""'.~.
Stories
Canopies
Signs
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Park Dedication
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Exterior remodeling* replacing shakes gutters, railings, porch floors
of Work
--
HV AC Contractor
Plumbing Contractor
Electric Contractor
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
~
Date 07/12/2007
Final/D.P. 00/00/0000
o Permit Voided I
Parcelld # 0703550000
In the performance of this work J agree to perform all work pursuant to rules goveming the described construction.
While the City of OShk~ has no authority t nforce easement restrictions of which it is not a party, if you perform the work
described in this perml a plication within se nt, the City strongly urges the permit applicant to contact the easement
holder(s) and to sesl!ih~ n nee sary a r als ore starting such activity. . I /
Signature ')(: , Date X. 7 //2..!.t:/7
Agent/Owner / I
Address W2380 COUNTY Q
BERLIN
WI 54923 - 0000 Telephone Number 920-361-7731
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is/ready.