Loading...
HomeMy WebLinkAbout0125763-Building (roof) e OSHKOSH ON THE WATER Job Address 810 FRANKLIN ST CITY OF OSHKOSH No 125763 BUILDING PERMIT - APPLICATION AND RECORD Owner NICOLE 0 VANORNUM Create Date 07/12/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size D Projection I Canopies Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. Unfinished/Basement Finished/Living Bedrooms Stories Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Remove and replace roof* No structural Eddies Roofing and Siding of the Fox Valley - Appleton. No structural work. of Work HV AC Contractor Plumbing Contractor Electric Contractor $13,600.00 Plan Approval $0.00 Permit Fee Paid $112.00 Park Dedication Fees: Valuation $0.00 Issued By: Date 07/12/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1006040000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 810 FRANKLIN ST Agent/Owner OSHKOSH WI 54901 - 4316 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.