HomeMy WebLinkAbout0125773-Building (Repair Units 44,50,70)
e
OSHKOSH
ON THE WATER
Job Address 215 DIVISION ST
CITY OF OSHKOSH No 125773
BUILDING PERMIT - APPLICATION AND RECORD
Owner SHIVA CORP Create Date 07/12/2007
Designer
Contractor CRAIG STAPEL
Category
202 - Alteration Hotels, Motels, Tourist Cabins Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
D Projection I
Finished/Living
Sq.Ft.
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
o Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
. Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature Motel/ Units 44, 50, 70- Remove replace damaged drywall and studs in bathrooms, install tub surrounds. Replace damaged drywall at
of Work vanity in unit 70.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuati
$1,500.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 07/12/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0101360000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in thitiPe it aP.Plication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to re allY necess provals be r starting such activity.
Signature. Dat~- / Z ~ 07
Agent/Owner
Address 908 E PARKWAY AVE
OSHKOSH
WI 54901 - 0000 Telephone Number 232-1374
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.