Loading...
HomeMy WebLinkAboutLetter-Ahern (Fire Protection System Installation J. F. AHERN CO. MECHANICAL & FIRE PROTECTION CONTRACTORS 201 Morris Court, P.O. Box 1316 Fond du Lac, WI 54936-1316 (920) 921-9020 p · (920) 921-8666 f www.jfahern.com June 18, 2007 Building Inspector -- Brian N oe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, VVI 54901 T-920/236-5051 F-920/236-1130 RE: FIRE PROTECTION SYSTEM INSTALLATION BALDOR ELECTRIC 3815 OREGON STREET OSHKOSH, WI 54902 AHERN FIRE PROTECTION CONTRACT No. 490501 Dear Brian: Enclosed is a copy ofthe Contractor's Material and Test Certificates covering the above-referenced Fire Protection System Installation for your files. Very truly yours, AHERN FIRE PROTECTION A division of J. F. Ahem Co. ~!lJ.$~w Mark L. Jozefowski, Superintendent MLJ/hmw LCITY 6-18-07.DOC R I JUN 2 0 2007 D DEPART~~ENT OF COMMUNITY DEVELOPMENT INSPECTION SERVICES DIVISION Building the Midwest Since 1880 An Equal Opportunity Employer AHERN FIRE PROTECTION Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authoritv's reauirements or local ordinances. PROPERTY NAME Baldor Electric AFP Contract #: 490501 I DATE: May 9, 2007 PROPERTY ADDRESS 3815 OreQon Street Oshkosh, WI 54902 ACCEPTED BY APPROVING AUTHORITIES (NAMES) 1, Factory Mutual Global (Mr, Kim McCluskey p, E.) 2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky) 3. City of Oshkosh (Building Inspector -- Brian Noe) 4, At;>DRESS Plans 1. W184 N8311 Tours Drive -- Menomonee Falls, WI 53051 2, 101 Court Street -- Oshkosh, WI 54901 3. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901 4. INSTALLATION CONFORMS TO ACCEPTED PLANS a~~~ DNO EQUIPMENT USED IS APPROVED DNO IF NO, EXPLAIN DEVIATIONS " HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION g"YES DNO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? INSTRUCTIONS IF NO, EXPLAIN HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: Item No.'s2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION DYES DNO be forwarded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS DYES DNO at closeout time. 3, NFPA 25 DYES DNO LOCATION OF SUPPLIES BUILDINGS SYSTEM System #4 -- Paint Booth MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE MANUFACTURE FACTOR RATING Vikina Micromatic M VK202 Pendent 3/4" Bronze 2007 8.0 20 286 Dea. Vikina Micromatic M VK166 Dry Pendent 3/4" Bronze 2007 8.0 4 286 Deg. SPRINKLERS PIPE AND TYPE OF PIPE Schedule 10: Schedule 40 FITTINGS TYPE OF FITTINGS Grooved: Threaded: Welded Outlets: Mechanical Tees FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION TYPE MAKE MODEL MIN. SEC. Existing Water Flow Switch N/A EXPLAIN ANY ALARM PROBLEMS: ALARM ALARM OPERATED DEVICES LOW AIR ALARM DEVICE I MAKE I MODEL PRESSURE PROPERLY TYPE SETTING PSI N/A YES 1 NO I EXPLAIN ANY ALARM PROBLEMS: CENTRAL MONITORING SIGNALS RECEIVED ALARM SERVICE LOCATION(S) TYPE OR PRESSURE LOW-AIR NAME OF REMOTE WATERFLOW SWITCH OTHER SERVICE DETECTOR FLOW SUPERVISORY SUPERVISING LOCATION(S): STATION (ON-5ITE) REMOTE NAME OF SERVICE: REMOTE MONITORING ALARM SERVICE SIGNALING (OFF-5ITE) PHONE: OTHER: LOCATION(S): EXPLAIN ANY ALARM SIGNALING PROBLEMS: DRY VALVE Q.O.D. . MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. TIME TO TRIP WATER TRIP POINT AIR TIME WATER ALARM THROUGH TEST AIR PRESSURE REACHED TEST OPERATED CONNECTION,,2 PRESSURE PRESSURE OUTLET 1,2 PROPERLY DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO OPERATING WITHOUT TEST Q.O.O, WITH Q.O.O. IF NO, EXPLAIN: . OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISED DYES DNO DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES DNO IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN DELUGE & CIRCUIT FOR TESTING PREACTION DYES DNO VALVES DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE SUPERVISION MAKE MODEL LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE YES NO YES NO MIN. SEC. LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE PRESSURE FLOOR (FLOWING) REDUCING INLET OUTLET INLET OUTLET FLOW VALVE TEST (PSI) (PSI) (PSI) (PSI) (GPM) . Ahern Fire Protection '" 1 MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED. ... 2 NFPA 13 ONLY REQUIRES THE 60-8ECONO LIMITATION IN SPECIFIC SECTIONS. ., 2 TEST DESCRIPTION TESTS BLANK TESTING GASKETS WELDING CUTOUTS (DISCS HYDRAULIC DATA NAMEPLATE REMARKS ADDITIONAL Ahern Fire Protection HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static pressure in excess of 150 psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage. All aboveground piping leakage shall be stopped. PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed H/2 psi (0.1 bars) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT ~ PSI L-Bar) for _ HRS. IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED 0 YES 0 NO EQUIPMENT OPERATES PROPERLY 0 YES 0 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FORTESTING SYSTEMS OR STOPPING LEAKS? crYES 0 NO DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST TEST SUPPLY TEST CONNECTION:_ PSI ( Bar) CONNECTION OPEN WIDE: _ PSI LBar) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES 0 NO IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS IF NO, EXPLAIN REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED? DYES 0 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS J2I' YES QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? NUMBER USED 1 WELDED PIPING LOCATIONS (3 uJAjt1/ffAJ !2h'ES 0 NO IF YES... DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROLPROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS DISCS ARE RETRIEVED? NAME PLATE PROVIDED IZf YES 0 NO DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: NAME OF SPRINKLER CONTRACTOR AHERN FIRE PROTECTION, 201 MORRIS COURT -- FOND DU LAC, WI 54935 TESTS WITNESSED BY TION (SIGNED) TITLE TITLE -.:~ 3 NUMBER REMOVED I pfYES oNO oNO 0YES oNO YES 0 NO IF NO, EXPLAIN .c7 DATE -;;:2:)--d~