Loading...
HomeMy WebLinkAbout07-189 JULY 10,2007 07 -189 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO.1, PUBLIC WORKS CONTRACT NO. 06-14 ($35,039.60) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: Kruczek Construction Inc. 3636 Kewaunee Rd. Green Bay, WI 54311 Net Increase to contract: $35,039.50 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Accl. No. 541-1810-1799-00000 - Water Utility - Construction in Progress TO: Kruczek Construction Inc. 3636 Kewaunee Rd. Green Bay, WI 54311 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET INCREASE TO: SECTION 1- WATER MAIN NET INCREASE TO CONTRACT: Recommended: Director of Public Works CHANGE ORDER # 1 DATED: June 21,2007 06-14 , is hereby amended $35,039.50 $35,039.50 CITY OF OSHKOSH BY: City Manager City Clerk ved and accepted: ~~ Contractor - I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT: 06-14 CHANGE ORDER # 1 SECTION I - WATER MAIN ITEM INSTALLED NET NET COST PER INCREASE IN DECI'?EASE IN NUMBER DESCRIPTION CONTRACT QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT QUANTITIES PRICE PRICE 1. Furnish and install approx. . five (5) linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 5.00 8.00 3.00 $50.00 $150.00 2. Furnish and install approx. ten (10) linear feet of 8" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 10.00 10.00 $55.00 3. Fumish and install approx. 2,750 linear feet of 12" Ductile Iron Water Main w/poly wrap, complete as specified, (fittings not included), per linear foot 2,750.00 2,751.00 1.00 $26.00 $26.00 4. Furnish and bore/jack approx. 130 linear feet of 20" Steel Casing Pipe (non coated,O.312 in. thickness), complete as specified, per linear foot 130.00 130.00 $245.00 5. Furnish and install approx. one (1) 12" x 6" Tee, complete as specified, each 1.00 1.00 $435.00 6. Furnish and install approx. one (1), 12" x 8" Tee, complete as specified, each 1.00 1.00 $470.00 7. Furnish and install approx. one (1), Cut-in 12" x 12" Tee, complete as specified, each 1.00 1.00 $1,220.00 8. Furnish and install approx. one (1), 8" x 6" Reducer, complete as specified, each 1.00 1.00 $140.00 9. Furnish and install approx. four (4), 12" - 45 degree Bends, complete as specified, each 4.00 10.00 6.00 $325.00 $1,950.00 Page 1 CONTRACT: 06-14 CHANGE ORDER # 1 ITEM INSTALLED NET NET COST PER INCREASE IN DECF?EASE IN DESCRIPTION CONTRACT CONTRACT NUMBER CONTRACT QUANTITIES INCREASE DECREASE UNIT PRICE PRICE QUANTITIES 10. Furnish and install one (1), 6" Valve, complete as specified, each 1.00 1.00 $750.00 11. Furnish and install approx. one (1), 8" Valve, complete as specified, each 1.00 1.00 $900.00 12. Furnish and install approx. three (3), 12" Water Valve in Std. Water Valve Manhole, complete as soecified,each 3.00 4.00 1.00 $3,135.00 $3,135.00 13. Furnish and install approx. two (2) Hydrants, complete as specified, - each 2.00 2.00 $1,980.00 14. Furnish and install approx. one (1) Gradelok for hydrant branches, complete as specified, each 1.00 1.00 $335.00 15. Furnish, install and maintain one (1) Tracking Pad, each 1.00 1.00 $500.00 16 Clear approx. 25 inch dia. of undistributed trees as specified, per inch diameter 25.00 217.00 192.00 $20.00 $3,840.00 17 Grub approx. 25 inch dia. of undistributed trees as specified, per inch diameter 25.00 217.00 192.00 $20.00 $3,840.00 18 Furnish, install and maintain all erosion control measures, complete as specified, lump sum 1.00 1.00 $1,500.00 19 Complete all restoration, complete as specified, lumo sum 1.00 0.50 -0.50 $2,835.00 ($1,417.50) 20 Provide $1,000.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $1,000.00 SECTION I - (BID ITEMS 1 - 20) - SUB.TOTALS $12,941.00 ($1,417.50) Page 2 CONTRACT: 06-14 CHANGE ORDER # 1 ITEM INSTALLED NET NET COST PER INCREASE IN DECI'?EASE IN DESCRIPTION CONTRACT CONTRACT NUMBER CONTRACT QUANTITIES INCREASE DECREASE UNIT PRICE PRICE QUANTITIES ADDITIONAL WORK REQUIRED: C.O. # 1 . SECTION I ITEM INSTALLED NET NET COST PER INCREASE IN DECI'?EASE IN NUMBER DESCRIPTION CONTRACT QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT QUANTITIES PRICE PRICE 1 Extra work required to grout voids under airport taxiway, lump sum 1.00 1.00 $7,116.00 $7,116.00 2 Extra work required to jack and bore 130 lineal ft. of 20" steel casing pipe under airport taxiway through bedrock, lump sum 1.00 1.00 $16,400.00 $16,400.00 NET INCREASE TO SECTION I - $23,516.00 $35,039.50 $0.00 ADDITIONAL WORK: C.O. # 1 . (ITEM 1) - SUB-TOTAL NET INCREASE TO CONTRACT: $35,039.50 Page 3