Loading...
HomeMy WebLinkAbout0125683-Building :.~ ,,~ ...., o OSHKOSH ON THE WATER Job Address 359 KNAPP ST CITY OF OSHKOSH No 125683 BUILDING PERMIT - APPLICATION AND RECORD Owner TAMMY L WAGNER Create Date 07/09/2007 Designer Contractor STEVE WIRTZ CONSTRUCTION Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI Remodeling the basement to include a rec room, sewing room, bedroom, and bathroom. A minimum of 7' ceiling height is required of Work or 50% of the room floor area. Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuati~n \l 1\,.....,- $15,000.00 Plan Approval Issued By: ~ $50.00 Permit Fee Paid $118.00 Park Dedication $0.00 Date 07/09/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0608701700 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) andt ecure an neces ~pro~ before starting such activity. Signature ~ tV ~ Agent/Owner DalY 7- 9'-07 FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-6063 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. " .. -- ~~ ...~ . - ... ....- --+~... ....... .. . :_-"-_._......;...---_._.,~- --~ ~ ~.. <<:::) .~ 1 q:; ......3- ~, "_ .._~i3 . ~--._~--~----l--1A-. --,--"- ...":~t l. e/i.... ... .. .. - _.~f!~;'" 11 on .. / ~ 6 .~..)-,.,-)I.. . J qs <J~,.-.~-...-. ...1:. ._~ 'X, ~ ~