HomeMy WebLinkAbout0125646-Building (bath remodel & siding)
~"G
OSHKOSH
ON THE WATER
Job Address 544 BOWEN ST
CITY OF OSHKOSH
No
125646
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID/JENNIFER SCHOENBERGER- LAUER Create Date
06/25/2007
Designer
Contractor OWNER
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft.
Finished/Living Sq.Ft. Bedrooms Stories
Garage Sq.Ft. Baths
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
o Projection I
Canopies
Signs
Use/Nature SFRI Remodel bathrooms & siding* replacing the front door. The second floor wil be rearranged to include a hallway and closing off a
of Work doorway from 1 bedroom to the bathroom. The lower bathroom will also be remodeled.
HV AC Contractor
Plumbing Contractor SAMMONS PLUMBING
Electric Contractor WITZKE ELECTRIC INC
Fees: Valuation
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Issued By:
cvr
Date 07/06/2007 Final/O.P. 00/00/0000
o Permit Voided I
Parcel Id # 1102330000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ap Ii ion within an easement, the ity strongly urges the permit applicant to contact the easement
holder(s) and to s~ny ne ssary ap' before rting such activity.
Signature Date ----"'\ ~/ 0 '7
OSHKOSH
WI 54904 - 0000 Telephone Number
Address 102 N OAKWOOD RD
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.