Loading...
HomeMy WebLinkAbout0125649-Building (driveway) e OSHKOSH ON THE WATER Job Address 1090 W 19TH AVE CITY OF OSHKOSH No 125649 BUILDING PERMIT - APPLICATION AND RECORD Owner GREGORY R M BEHLING Create Date 07/06/2007 Designer Contractor OWNER Category 256 - Parking Lots, Driveways Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI Replacing the driveway' and front sidewalk fro the driveway to the house. The driveway shall not exceed the width of the garage. I of Work Plumbing Contractor HVAC Contractor Electric Contractor Fees: Valuation $2,600.00 Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Issued By: ~ Date 07/06/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1311600000 I In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se~ any necessary approvals before starting such activity. Signature x-/;;J)1~'iQ ,(}/11>J.9.~/ Date X !}--.(;"-o'i . ( 1 Agent/Owner ' Address 1090 W 19TH AVE OSHKOSH WI 54902 - 6604 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.