HomeMy WebLinkAbout0125649-Building (driveway)
e
OSHKOSH
ON THE WATER
Job Address 1090 W 19TH AVE
CITY OF OSHKOSH No 125649
BUILDING PERMIT - APPLICATION AND RECORD
Owner GREGORY R M BEHLING Create Date 07/06/2007
Designer
Contractor OWNER
Category
256 - Parking Lots, Driveways Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Signs
Garage
Baths
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFRI Replacing the driveway' and front sidewalk fro the driveway to the house. The driveway shall not exceed the width of the garage. I
of Work
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation
$2,600.00 Plan Approval
$0.00 Permit Fee Paid
$39.00 Park Dedication
$0.00
Issued By:
~
Date 07/06/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1311600000
I
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se~ any necessary approvals before starting such activity.
Signature x-/;;J)1~'iQ ,(}/11>J.9.~/ Date X !}--.(;"-o'i
. ( 1 Agent/Owner '
Address 1090 W 19TH AVE
OSHKOSH
WI 54902 - 6604 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.