HomeMy WebLinkAbout2007-Plumbing (RPZ valve)
e
OSHKOSH
ON THE WATER
Job Address 102 W 5TH AVE
PLUMBING PERMIT - APPLICATION AND RECORD
CITY OF OSHKOSH No 125665
Owner LLC RIVERFRONT DEVELOPMENT II Create Date 07/06/2007
Plan
Category 440 - Industrial-Interior
Contractor O'NEILL ENTERPRISES INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
0
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Install containment RPZ valve and water only meter on Marina water distribution. Plan review will be required to correct the distribution sizing
per COMM 82.20 ***Debit Account
Size
Material
#
Conn. Type
Parcel Id #
0300020000
Date 07/06/2007
Type
Sanitary Sewer
Storm Sewer
Water Service
$2,000.00
$0.00
$25.00 D Permit Voided I
Permit Fees
Plan Approval
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 522 W 6TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 5916 Telephone Number 920-230-2007
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready atthe time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.