HomeMy WebLinkAbout0125616-Plumbing
o
OSHKOSH
ON THE WATER
Job Address 724 VINE AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MRlMRS PATRICK J HELBLING
Contractor D & S MECHANICAUAZMS LLC
Category 410 - Residential-Interior
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal 1 Bidet Sculry Sink Wash Ftn
~
Res. Sink Dishwasher 1 Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
No
125616
Create Date 07/02/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Kitchen remodel and repipe 2nd floor DWV and water in ceiling.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0502940000
Use/Nature
of Work
Valuation
$1,600.00
Plan Approval
$0.00
$28.00 D Permit Voided I
Permit Fees
Issued By
Date 07/03/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this perr;qit application within an ease t, ity strongly urges the permit applicant to contact the ~
easement holder ~rid to secur t?ecessa ar:! ov before starting such activity.
"gnatu"' ' - " V x D.te - "" ~ (
Agent/Owner
Address 4308 SPRINGBROOK LN
OMRO
WI 54963 - 0000 Telephone Number 920-685-5263
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.