HomeMy WebLinkAbout0125631-Building (porch)
o
OSHKOSH
ON THE WATER
Job Address 226 W 8TH AVE
CITY OF OSHKOSH No 125631
BUILDING PERMIT - APPLICATION AND RECORD
Owner DENNIS P PANICH TRUST Create Date 07/03/2007
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFR/ Constructing a 4'x6' landing with steps off the front of the house. * The porch will have a minimum of 48" of frost protection and code
of Work compliant handrails and guardrails.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $2,500.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$39.00 Park Dedication
$0.00
Date 07/03/2007
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 0900380000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure" n necessary ap ovals before starting such activity.
Signature ____
AgenUOwner
OSHKOSH
Date~/-3~O
Address
WI 54901 - 2536 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.