Loading...
HomeMy WebLinkAbout0125631-Building (porch) o OSHKOSH ON THE WATER Job Address 226 W 8TH AVE CITY OF OSHKOSH No 125631 BUILDING PERMIT - APPLICATION AND RECORD Owner DENNIS P PANICH TRUST Create Date 07/03/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFR/ Constructing a 4'x6' landing with steps off the front of the house. * The porch will have a minimum of 48" of frost protection and code of Work compliant handrails and guardrails. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,500.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Date 07/03/2007 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 0900380000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure" n necessary ap ovals before starting such activity. Signature ____ AgenUOwner OSHKOSH Date~/-3~O Address WI 54901 - 2536 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.