Loading...
HomeMy WebLinkAbout0125573-Plumbing (interior) o OSHKOSH ON THE WATER Job Address 908 WISCONSIN ST CITY OF OSHKOSH No 125573 PLUMBING PERMIT - APPLICATION AND RECORD 2 Shower Floor Drain Owner KARGUS PROPERTIES LLC Create Date 06/12/2007 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor LUDWIG'S PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By 2 2 1 Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind silcock NSFRI New single family' Bi-Ievel interior plumbing with gas water heater. Water calc sheet required to be submitted. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0501450000 $7,000.00 $0.00 $91.00 0 Permit Voided I Plan Approval Permit Fees Date 06/29/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH Address 1903 ASHLAND AVE WI 54901 - 2303 Telephone Number 231-5770 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.