HomeMy WebLinkAboutPlumbing Y2-255-0607-P
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5052 (920) 236-5184 FAX
ON THE WATER
June 29, 2007
O'Neill Enterprises Inc.
522 W. 6th Ave.
Oshkosh, WI 54902
Ref: Plumbing Plan Approval:
Pacur Inc. (Warehouse addition)
3555 Moser St., Oshkosh, WI
Plan 10# Y2-255-0607-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. Roof drains shall comply with COMM 82.36 for strainer elevation above roof and strainer
opening per roof leader area served.
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfu lIy,
Richard Wood,
Plumbing Inspector