HomeMy WebLinkAbout0125550-Building (roof)
o
OSHKOSH
ON THE WATER
Job Address 1195 S WESTHA VEN DR
CITY OF OSHKOSH No
125550
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS P/SUSAN L KRAUS Create Date
06/28/2007
Designer
Contractor DANE CONSTRUCTION
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
UnfinishedfBasement
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
UsefNature SFR / TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE AND GARAGE, NO STRUCTURAL CHANGES
of Work
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees, Veln.Uon ~5'300.00
Issued By: ~
r
Plan Approval
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
Date 06/28/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1313160000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature IJ~ ~ Date ?-'-:2tfr--c?7
~ AgenUOwner
Address 3155 HALLIE HALLOW DR Oshkosh WI 54904 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.