HomeMy WebLinkAbout0125547-Building (exterior remodel)
G
OSHKOSH
ON THE WATER
Job Address 53 EVELINE ST
CITY OF OSHKOSH No 125547
BUILDING PERMIT - APPLICATION AND RECORD
Owner KEITH J NAJDOWSKI Create Date 06/18/2007
Designer
Contractor
D & J QUALITY CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
-
Bedrooms Stories Canopies
Baths Signs
-
Zoning
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Finished/Living
Garage
Sq.Ft.
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Exterior remodeling" D&J to repair termite damage on the north side of the house including wall framing, new siding and basement
of Work windows. The owner will do the windows and side/ rear landing and steps. All work to be completed by August 31, 2007.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$8,000.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
~
Date 06/28/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0804130000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessa ppr Is before startin ch activity.
Date
~("
Signature
Address
WI 54901 - 0000
Telephone Number
232-0538
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.