Loading...
HomeMy WebLinkAboutHVAC Conditional Approval - 06/22/2007 """-/I commerce.wi.gov ~i!~gJ!!Jen RECEIVED JUN 2 5 2007 DEPARTMENT OF COMMUNITY DEVELOPMENT !N~PECTIOPJ SCR'v'!CI:S Dl'vl~iUN Safety and Buildings PO BOX 7162 MADISON WI 53707-7162 TDD #: (608) 264-8777 www.commerce.wLgov/sb/ www.wisconsin.gov Jim Doyle, Governor Mary P. Burke, Secretary June 22,2007 CUSTIDNo.913039 AITN: Buildings & Structures Building Inspector KEITH PAUL GARTMAN MECHANICAL SERVICES 520 W SOUTH PARK A VB OSHKOSH WI 54902 BUILDING INSPECTION CITY OF OSHKOSH POB 1130 OSHKOSH WI 54902 (Please forward a copy of this letter to the fire department conducting inspections of this project.) CONDITIONAL APPROVAL PLAN APPROVAL EXPIRES: 02/22/2009 SITE: Proex 3015 N Main St City of Oshkosh, 54903 FOR: Object Type: HV AC ICC System Regulated Object ill No.: 1138759 The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all cod.e requirements. The following conditions shall be met during construction or installation and prior to occupancy or use: Reminders . IMC 313/Comm 64.0313(1) HV AC system balancing shall be performed, and a report shall be made available to the department upon requesL . . Comm 61.36(1)(a) & (b) This approval will expire 2 years after the date of approval of the building plans if the building shell is not closed in within those 2 years, Also, this approval will expire 3 years after the date of building plan approvalifthe'..vork covered by this approval is not completed and the building ready for occupancy within those 3 years. A copy of the approved plans, specifications and this letter shall be on-site during construction and open to inspection by authorized representatives of the Department, which may include local inspectors. If plan index sheets were submitted in lieu of additionalJull plansets, a copy ofthis approval letter and index sheet shall be attached to plans that correspond with the copy on file with the DepartmenL All permits required by the state or the local municipality shall be obtained prior to commencement of construction/installation/operation. If this construction project will disturb one or more acres of land, an Erosion Control Notice of Intent (NOI) shall be filed with the department 7 days prior to any earth disturbing activities. You will need to either file the NO! and an erosion control plan summary on-line at www.commerce.wi.gov/sb or submit a completed NOI form and either a plan summary or complete plan to us, with additional fees, or to the certified municipality. In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing. a safe building, structure, or componenL Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address' on this letterhead. KEITH PAUL ~.. S. incerely, C\ \\ -A ~ .~'. ~--;;rr~- U .r-- Fokruddin Khondaker Engineering Consultant Building Systems, Integrated Services (608)266-1930,7:45-4:30 M-f fokruddin.khondaker@wisconsin.gov Page 2 6/22/2007 Fee Required $ Fee Received $ Balance Due $ 850.00 850.00 0.00 cc: Peter R Ochs, State Building Inspector, (920) 948-3500 , Friday, 7:45 A.M. - 4:30 P.M. Gms Inc Dan Dowling Proposed Rules: The Wisconsin Division of Safety & Buildings is in the process of adopting the 2006 International Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective date in the second half of 2007. You may view or download the proposed chs. Comm 61-65 hearing draft at www.commerce.wi.gov/SB/SB-CodeDevelopment.htrnl New Rules: Effective April 1, 2007, the Division of Safety & Buildings will be implementing new erosion Gontrol and stormwater rules in ch. Comm 60 for projects begun on or after that date. You may view or download the rules at www.commerce.wi.gov/SB/SB-CodeDevelopment.htrnl Included in the rules will be expanded erosion control coverage for all commercial construction sites regardless of size. Required erosion control submittal information to us may be done with a planned on-line webtool.