June 22,2007
CUSTIDNo.913039
AITN: Buildings & Structures Building Inspector
KEITH PAUL
GARTMAN MECHANICAL SERVICES
520 W SOUTH PARK A VB
OSHKOSH WI 54902
BUILDING INSPECTION
CITY OF OSHKOSH
POB 1130
OSHKOSH WI 54902
(Please forward a copy of this letter to the fire
department conducting inspections of this project.)
CONDITIONAL APPROVAL
PLAN APPROVAL EXPIRES: 02/22/2009
SITE:
Proex
3015 N Main St
City of Oshkosh, 54903
FOR:
Object Type: HV AC ICC System Regulated Object ill No.: 1138759
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes
and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in
chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all cod.e requirements.
The following conditions shall be met during construction or installation and prior to occupancy or use:
Reminders
. IMC 313/Comm 64.0313(1) HV AC system balancing shall be performed, and a report shall be made available
to the department upon requesL .
. Comm 61.36(1)(a) & (b) This approval will expire 2 years after the date of approval of the building plans if the
building shell is not closed in within those 2 years, Also, this approval will expire 3 years after the date of
building plan approvalifthe'..vork covered by this approval is not completed and the building ready for
occupancy within those 3 years.
A copy of the approved plans, specifications and this letter shall be on-site during construction and open to
inspection by authorized representatives of the Department, which may include local inspectors. If plan index sheets
were submitted in lieu of additionalJull plansets, a copy ofthis approval letter and index sheet shall be attached to
plans that correspond with the copy on file with the DepartmenL All permits required by the state or the local
municipality shall be obtained prior to commencement of construction/installation/operation.
If this construction project will disturb one or more acres of land, an Erosion Control Notice of Intent (NOI) shall be
filed with the department 7 days prior to any earth disturbing activities. You will need to either file the NO! and an
erosion control plan summary on-line at www.commerce.wi.gov/sb or submit a completed NOI form and either a
plan summary or complete plan to us, with additional fees, or to the certified municipality.
In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should
conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review
shall relieve the designer of the responsibility for designing. a safe building, structure, or componenL
Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address'
on this letterhead.
KEITH PAUL
~..
S. incerely, C\ \\ -A ~
.~'. ~--;;rr~-
U
.r--
Fokruddin Khondaker
Engineering Consultant Building Systems, Integrated Services
(608)266-1930,7:45-4:30 M-f
fokruddin.khondaker@wisconsin.gov
Page 2
6/22/2007
Fee Required $
Fee Received $
Balance Due $
850.00
850.00
0.00
cc: Peter R Ochs, State Building Inspector, (920) 948-3500 , Friday, 7:45 A.M. - 4:30 P.M.
Gms Inc
Dan Dowling
Proposed Rules: The Wisconsin Division of Safety & Buildings is in the process of adopting the 2006 International
Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective
date in the second half of 2007. You may view or download the proposed chs. Comm 61-65 hearing draft at
www.commerce.wi.gov/SB/SB-CodeDevelopment.htrnl
New Rules: Effective April 1, 2007, the Division of Safety & Buildings will be implementing new erosion Gontrol
and stormwater rules in ch. Comm 60 for projects begun on or after that date. You may view or download the rules
at www.commerce.wi.gov/SB/SB-CodeDevelopment.htrnl Included in the rules will be expanded erosion control
coverage for all commercial construction sites regardless of size. Required erosion control submittal information to
us may be done with a planned on-line webtool.