HomeMy WebLinkAbout0125529-Building
o
OSHKOSH
ON THE WATER
Job Address 1280 GREENFIELD TRL
CITY OF OSHKOSH No 125529
BUILDING PERMIT - APPLICATION AND RECORD
Owner REBECCA J MEYER Create Date 06/21/2007
Designer
Contractor OWNER
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Finished/Living
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
o Projection I
Unfinished/Basement
Canopies
Bedrooms
Stories
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFRI Gutting the 1st floor bathroom. Installing new insulation, drywall, cabinets, flooring. *No walls are being moved and there is an
of Work existig exhaust fan.
HV AC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor UNKNOWN????
Fees: Valuation $2,000.00 Plan Approval
Issued By: ~S-
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Date 06/27/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcel Id # 1314800000
In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1280 GREENFIELD TRL
Agent/Owner
OSHKOSH
WI 54904 - 0000
Telephone Number
420-4348
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.