Loading...
HomeMy WebLinkAbout0125529-Building o OSHKOSH ON THE WATER Job Address 1280 GREENFIELD TRL CITY OF OSHKOSH No 125529 BUILDING PERMIT - APPLICATION AND RECORD Owner REBECCA J MEYER Create Date 06/21/2007 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Finished/Living Sq.Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. o Projection I Unfinished/Basement Canopies Bedrooms Stories Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI Gutting the 1st floor bathroom. Installing new insulation, drywall, cabinets, flooring. *No walls are being moved and there is an of Work existig exhaust fan. HV AC Contractor Plumbing Contractor UNKNOWN Electric Contractor UNKNOWN???? Fees: Valuation $2,000.00 Plan Approval Issued By: ~S- $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 06/27/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 1314800000 In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1280 GREENFIELD TRL Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 420-4348 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.