HomeMy WebLinkAboutLetter-to Miron Construction (sanitary sewer)
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5049 (920) 236-5106 FAX
ON THE WATER
April 23, 2007
Ms. Wendy Leeman
Miron Construction Co.
P.O. Box 509
Neenah, WI 54957-0509
Re: Sanitary sewer availability for the proposed Air Control Tower for Wittman
Regional Airport. 3120- 3'30 Knq,op Sf.
Dear Ms. Leeman,
The City of Oshkosh does not currently have a public sanitary sewer main
available to the site you have indicated will be the location of the new aviation air control
tower at 3120 Knapp Street Road in the City of Oshkosh. The closest sanitary sewer
main is located at the intersection of W. Waukau Ave. and Poberezny Rd.. The City of
Oshkosh will not object to the placement of an onsite waste disposal system approved
under the rules outlined in the Department of Commerce Administrative Code for such
systems. The issuance of the required permit for this system will be the responsibility of
Winnebago County Planning.
The acceptance of an onsite waste disposal system for this site does not
preclude the requirementof the property owner to comply with requirements of the
Municipal Ordinance for the City of O$hkosh when/if a public sewer is made available to
the property. Under the current ordinance, the owner would be required to abandon the
onsite waste system and make a private connection to the public system when it is
determined that the sanitary sewer is available to the property.
If you have questions regarding this material, feel free to call. (236-5049)
Respectfu lIy,
~/Wn/
Richard Wood
Plumbing Inspector
cc. Dave Patek, Director of Public Works
Steve Gohde, Assistant Director of Public Works