Loading...
HomeMy WebLinkAboutLetter-to Miron Construction (sanitary sewer) City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5049 (920) 236-5106 FAX ON THE WATER April 23, 2007 Ms. Wendy Leeman Miron Construction Co. P.O. Box 509 Neenah, WI 54957-0509 Re: Sanitary sewer availability for the proposed Air Control Tower for Wittman Regional Airport. 3120- 3'30 Knq,op Sf. Dear Ms. Leeman, The City of Oshkosh does not currently have a public sanitary sewer main available to the site you have indicated will be the location of the new aviation air control tower at 3120 Knapp Street Road in the City of Oshkosh. The closest sanitary sewer main is located at the intersection of W. Waukau Ave. and Poberezny Rd.. The City of Oshkosh will not object to the placement of an onsite waste disposal system approved under the rules outlined in the Department of Commerce Administrative Code for such systems. The issuance of the required permit for this system will be the responsibility of Winnebago County Planning. The acceptance of an onsite waste disposal system for this site does not preclude the requirementof the property owner to comply with requirements of the Municipal Ordinance for the City of O$hkosh when/if a public sewer is made available to the property. Under the current ordinance, the owner would be required to abandon the onsite waste system and make a private connection to the public system when it is determined that the sanitary sewer is available to the property. If you have questions regarding this material, feel free to call. (236-5049) Respectfu lIy, ~/Wn/ Richard Wood Plumbing Inspector cc. Dave Patek, Director of Public Works Steve Gohde, Assistant Director of Public Works