HomeMy WebLinkAbout0125497-Building (interior remodel)
o
OSHKOSH
ON THE WATER
Job Address 655 W SOUTH PARK AVE
CITY OF OSHKOSH No
125497
BUILDING PERMIT - APPLICATION AND RECORD
Owner LISA D WALTHER Create Date
06/25/2007
Designer
Contractor OWNER
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
D Projection I
Finished/Living
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Sq. Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRllnterior remodeling* Replacing paneling with drywall in the living room and back hallway. Fireblocking may have to be added at the
of Work op and bottom of the walls if balloon framing is present. Durst will be insulating the house including foaming the b ox sills.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
J
Date 06/25/2007 FinaI/O.P. 00/0010000
D Permit Voided I
Parcel Id # 1304570000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s re ~ny c ss approv before starting such activity.
Date
~(~~{()!
Signature
Address 655 W SOUTH PARK AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.