HomeMy WebLinkAbout0125438-Building VOID
.
OSHKOSH
ON THE WATER
Job Address 609 SCHOOL AVE
CITY OF OSHKOSH
No 125438
BUILDING PERMIT - APPLICATION AND RECORD
va I D
Owner LILLIAN HACKBARTH
Create Date 06/21/2007
Designer
Contractor WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Canopies
Finished/Living
Sq. Ft.
Sq.Ft.
Bedrooms
Stories
Signs
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFR / INSTALL 5 VINYL REPLACEMENT WINDOW AND 1 STORM DOOR IN EXISTING OPENINGS, NO STRUCTURAL CHANGES
of Work "debt acct
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,380.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 06/21/2007
Final/O.P. 00/00/0000
. "'0Per~itVdid~cll WRONG ADDRESS
Parcelld # 0201430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform )he work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 235 MORRIS ST
Agent/Owner
FOND DU LAC
WI 54935 - 4938
Telephone Number
920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.