Loading...
HomeMy WebLinkAbout0125458-Plumbing (water heater) cD OSHKOSH ON THE WATER Job Address 606 E CUSTER AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 125458 Owner JAMES S KLEPPIN Create Date 06/22/2007 Category 411 - Residential-Water Heaters Contractor SAMMONS PLUMBING Plan Shower Water Softner Wait. 5t. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink EjectorlGrind Drink Ftn Serv Sink Bathtu b Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures UselNature SFR /INSTALL NG WATER HEATER **debt accf.----- of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Material Sanitary Sewer Storm Sewer Water Service Type Conn. Type $0.00 Permit Fees Parcelld # 1507360000 Valuation $600.00 Plan Approval Issued By ?5rT ~ # $25.00 0 Permit Voided I Date 06/22/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority toJenforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project isready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.