Loading...
HomeMy WebLinkAbout0125430-Plumbing G OSHKOSH ON THE WATER Job Address 359 KNAPP ST CITY OF OSHKOSH No 125430 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner TAMMY L WAGNER Create Date 06/21/2007 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor PLUMB-RITE PLUMBING LLC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Finish basement bathroom and add sink in basement. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0608701700 $3,500.00 $0.00 $28.00 D Permit Voided I Permit Fees Plan Approval Date 06/21/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s an to secure any necessary approvals before starting such activity. Signature ~ Date {, . Z! --0 7 Agent/Owner OAKFIELD WI 53065 - 0000 Telephone Number home 583-2379 Address W9055 CTY RD AS To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.