HomeMy WebLinkAbout0125415-Building (shed)
~e~
OSHKOSH
ON THE WATER
Job Address 665 FREDERICK ST
CITY OF OSHKOSH No 125415
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARTIN R/HEATHER A BRICK Create Date 06/20/2007
Designer
Contractor OWNER
Category
151 - New Utility Buildings-Sheds (Residential) Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height,Permit
Park Dedication
o
# Structures
o
# Dwelling Units
Use/Nature SFR/ 8' x 8' shed* to be built in the rear yard. The shed shall be anchored to resist uplift or movement.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
$400.00 Plan Approval
Issued By:
VI
Date 06/20/2007 Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0704300000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur~aff necessaryffProv~IS before starting such activity.
Signaturex /f'/#t5 a.~ ) Date /(& '20 'O-=;Z
Agent/Owner
Address 665 FREDERICK ST
OSHKOSH
WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
'!'
_,.._,._~.(o5.._._.Ei~Ey.t:;EJ.~.kL~ T..
__.s c...f\. \.. e:: 1 /I.:::: I a'.
_tAI\-'-J.:r~...._~}:tE:D ..- .,'"
__uB>I~._eL/._.
_.c:.5' .. -trOf'l\S~~ ...o.-.~.W %1: let ll'Y\.e-5 .
vJ
S+N
F:
\.I\t\\~
5' -s~
'i:
o
(}
('-
;i;!
>
I"'
t"
\__81--1
1
8'
1
Q.<.
), ~e,(
%
E
p
,..L
";,;,;;;,;a"
Ii
I;
HCu.s E.:
l,,,,ll...('e.-.<.e>
w->Cc<!.--Q~c.,,-
2. I
4"'/'
ID'1-r
\
I