HomeMy WebLinkAbout0125391-Building (parking lot)
G
OSHKOSH
ON THE WATER
Job Address 1101 MORELAND ST
CITY OF OSHKOSH No 125391
BUILDING PERMIT - APPLICATION AND RECORD
Owner GERRITT JIDONNA KLEINHUIZEN Create Date 06/19/2007
Designer
Contractor OWNER
Category
256 - Parking Lots, Driveways Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature partment / Repair existing parking lot. Compact existing damaged area and overlay with new layer of asp-halt.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Val
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 06/19/2007
FinallO.P. 00/00/0000
o Permit Voided I
Parcel Id # 1309020000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appli tion within an sement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure necessary als .e ore starti 9 such activity.
//
Date
G ~'TA.'~
/' '
Signature
~_.
Address
1115 E NEW YORK AVE
OSHKOSH
WI 54901 - 4030
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.