Loading...
HomeMy WebLinkAbout0125358-Building (garage) e 6SHKOSH ON THE WATER .Job Address 161 W 19TH AVE CITY OF OSHKOSH No 125358 BUILDING PERMIT - APPLICATION AND RECORD Owner PEGGY S CALDWELL Create Date 06/15/2007 Designer Contractor MEIDAM BUILDERS INC Category 149 - Raze detached garage, construct detached garage Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size 16' x 20' Unfinished/Basement Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Canopies Finished/Living Bedrooms Stories Garage ~ Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Not Required # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI Raze detached garage, and construct new 16' x 20' detached garage as per plans. Side yard set-back will be 3ft. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation .00 Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Issued By: Date 06/15/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1401960000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~~J Date (j-i~-'O-7 Agent/Owner Address W5283 FOX PINES CT APPLETON WI 54913 - 0000 Telephone Number 560-3167 -' To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.