HomeMy WebLinkAbout0125358-Building (garage)
e
6SHKOSH
ON THE WATER
.Job Address 161 W 19TH AVE
CITY OF OSHKOSH No 125358
BUILDING PERMIT - APPLICATION AND RECORD
Owner PEGGY S CALDWELL Create Date 06/15/2007
Designer
Contractor MEIDAM BUILDERS INC
Category
149 - Raze detached garage, construct detached garage Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size 16' x 20'
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Canopies
Finished/Living
Bedrooms
Stories
Garage
~ Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFRI Raze detached garage, and construct new 16' x 20' detached garage as per plans. Side yard set-back will be 3ft.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
.00 Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Issued By:
Date 06/15/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1401960000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature ~~J Date (j-i~-'O-7
Agent/Owner
Address W5283 FOX PINES CT
APPLETON
WI 54913 - 0000 Telephone Number 560-3167
-'
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.