Loading...
HomeMy WebLinkAbout0125362-Building (foundation) G OSHKOSH ON THE WATER Job Address 742 W 18TH AVE CITY OF OSHKOSH No 125362 BUILDING PERMIT - APPLICATION AND RECORD Owner LOIS M STEINHILBER Create Date 06/15/2007 Designer Contractor DAN DODGE MASONRY & CONCRETE Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature ~FRI Remove and reconstruct 6 ft each side of SW corner of foundation. Install drain tile on the inside and out, waterproof, backfill w/ of Work lear stone and install sump pit. HV AC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Date 06/15/2007 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1405860300 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit pplication wit . 'A?n easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see any n s ovals be <;lre s in such activity. / ---" ,...' '.i- / ~ O( ~ . Address 742 W 18TH AVE OSHKOSH WI 54902 - 6713 I- Telephone Numbe Signature To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.