HomeMy WebLinkAbout0125362-Building (foundation)
G
OSHKOSH
ON THE WATER
Job Address 742 W 18TH AVE
CITY OF OSHKOSH No 125362
BUILDING PERMIT - APPLICATION AND RECORD
Owner LOIS M STEINHILBER Create Date 06/15/2007
Designer
Contractor
DAN DODGE MASONRY & CONCRETE
Category
141 - Exterior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature ~FRI Remove and reconstruct 6 ft each side of SW corner of foundation. Install drain tile on the inside and out, waterproof, backfill w/
of Work lear stone and install sump pit.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$53.00 Park Dedication
$0.00
Date 06/15/2007
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 1405860300
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit pplication wit . 'A?n easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see any n s ovals be <;lre s in such activity.
/ ---" ,...' '.i- / ~
O( ~ .
Address 742 W 18TH AVE
OSHKOSH
WI 54902 - 6713
I-
Telephone Numbe
Signature
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.