Loading...
HomeMy WebLinkAbout0125334-Plumbing (toilet) #322 e OSHKOSH ON THE WATER Job Address 600 W PACKER AVE CITY OF OSHKOSH No 125334 PLUMBING PERMIT - APPLICATION AND RECORD Owner RESIDENTIAL SERVICE MANAGEMENT INC Create Date 06/14/2007 Category 410 - Residential-I nterior Plan Contractor D R GLAZE PLUMBING Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Gri nd Drink Ftn Serv Sink S9da Disp Misc. Fixtures Use/Nature Multifamily (Apt #322) 1 Replace toilet of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1219810200 $25.00 0 Permit Voided I Issued By $550.00 Plan Approval ~ $0.00 Permit Fees Valuation Date 06/14/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1865 JAMES RD AgenUOwner OSHKOSH WI 54904 - 6873 Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.