Loading...
HomeMy WebLinkAbout0125330-Building (kitchen) G OSHKOSH ON THE WATER Job Address 1633 GEORGIA ST CITY OF OSHKOSH No 125330 BUILDING PERMIT - APPLICATION AND RECORD Owner HERMAN B LEITZ Create Date 06/14/2007 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection: Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRllnstalling new kitchen cabinets, countertops and flooring (no walls are being opened). Installing 13 replacement windows (same of Work size and location). HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval Issued By: ~. &-- '-'" $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 06/14/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 1306933600 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure y necessary ore starting such activity. Agent/Owner RIPON Dat~l'0 -1<( --07 Signature Address WI 54971 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.