HomeMy WebLinkAbout0125290-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 908 WISCONSIN ST
CITY OF OSHKOSH No 125290
PLUMBING PERMIT - APPLICATION AND RECORD
Owner KARGUS PROPERTIES LLC Create Date 06/12/2007
Plan
Contractor MOREMAN PLBG & HTG SERVICE INC
Category 401 - Residential-Exterior (laterals)
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn S~rv Sink Soda Disp
Misc.
Fixtures
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
NSFRI Laterals
Size Material Type # Conn. Type
Sanitary Sewer 4" Plastic Lateral 1 New
Storm Sewer
Water Service 1-1/4" Plastic Lateral 1 New
Parcelld #
0501450000
Use/Nature
of Work
Valuation
$5,500.00 Plan Approval
$0.00
$100.00 D Permit Voided I
Permit Fees
Issued By
Date 06/12/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address PO BOX 1325
Agent/Owner
OSHKOSH
WI 54903 - 1325 Telephone Number 231-9191
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.