HomeMy WebLinkAbout0125256-Building (deck/fence)
,J
o
OSHKOSH
ON THE WATER
Job Address 2023 ASHLAND ST
CITY OF OSHKOSH No 125256
BUILDING PERMIT - APPLICATION AND RECORD
Owner LINDA A CARPIAUX Create Date 06/11/2007
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Signs
Garage
Sq.Ft.
Baths
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block . Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature ~FRllnstall a 10x20 deck and approx 140 lin ft of wood fence (enclosing rear yard.) 1 i 7 lin ft of 6' tall and approx 23 lin ft of 4' tall fence.
of Work . Permit obtained by The Landscape Company(fence.) Dan V. Binder (deck.)
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuatio
$5,300.00 Plan Approval
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
Issued By:
Date 06/11/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1516770000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce eas ent restrictions of which it is not a party, if you perform the work
described in this permit application within an easement e ity strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approval st rting such activity.
Signature
Date
Address
2023 ASHLAND ST
Agent/Owner
OSHKOSH
WI 54901 - 2305
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.