Loading...
HomeMy WebLinkAbout2007-Building (roof) G OSHKOSH ON THE WATER Job Address 751 W 4TH AVE CITY OF OSHKOSH No 125263 BUILDING PERMIT - APPLICATION AND RECORD Owner TROY C MILLER Create Date 06/11/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Signs Garage Sq. Ft. Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature ~FRI Re-roof & windows' the windows will be the same size and location and the existing roofing will be removed. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,500.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: ~ Date 06/11/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0602770000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu e any necessary appr v starting such activity. I Signature Date / !oj/I/o ;> . Address 751 W 4TH AVE OSHKOSH WI 54902 - 5803 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.