Loading...
HomeMy WebLinkAbout0125239-Building (roof) o OSHKOSH ON THE WATER Job Address 1202 CARR PL CITY OF OSHKOSH No 125239 BUILDING PERMIT - APPLICATION AND RECORD Owner ALAN E/JENNIFER A HOLLIS JR Create Date 06/06/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFR /TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE ONLY, NO STRUCTURAL CHANGES of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,600.00 Plan Approval Issued By: ~~ $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 06/08/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0804450000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary a provals before starting such activity. Date t J?A'7 I I / Signature Address 1202 CARR PL Agent/Owner OSHKOSH WI 54901 - 5414 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.