HomeMy WebLinkAbout0125232-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 2315 COMET ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ROBERT A PAWLIK
Contractor MOREMAN PLBG & HTG SERVICE INC
Category 401 - Residential-Exterior (laterals)
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
No 125232
Create Date 05/17/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature SFR/ Abandon laterals to raze the house and garage*. The site shall be made level and free of debris.***Debit Account
of Work
Wtr Usage Mtrs
Valuation
Issued By
Size
Material
Type
#
Conn. Type
$500.00
Plan Approval
$0.00
$25.00 0 Permit Voided I
Parcelld #
1518070000
Permit Fees
Sanitary Sewer
Storm Sewer
Water Service
Date 06/08/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address PO BOX 1325
Agent/Owner
OSHKOSH
WI 54903 - 1325 Telephone Number 231-9191
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otheryvise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not. performed within two business days from the time the project is ready.