HomeMy WebLinkAbout0125237-Plumbing (RPZ valve)
CITY OF OSHKOSH No 125237
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CITY CENTER ASSOCIATES LLC Create Date 06/08/2007
Plan
Contractor D.R. HANSEN PLBG.
Category 440 - Industrial-Interior
.
OSHKOSH
ON THE WATER
Job Address 250 CITY CENTER
Shower Water Softner Wait. St.
Floor Drain Local Waste Ice Chest
Lndry Tray Clothes Wshr Exam Sink
Disposal Bidet Sculry Sink
Dishwasher Beer Tap Hand Sink
Sump Pump Lab Sink Plaster Sink
Classrm Sink Sterilizer Surgeons Sink
Breakrm Sink Dip Well F Prep Sink
Ejector/Grind Drink Ftn Serv Sink
Shamp Sink
Flr/Wst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Install RPZ valve on water supply to humidifier****Debit Account
of Work
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation
Issued By
Size
Material
Type
#
Conn. Type
$250.00
Plan Approval
$0.00
$25.00 0 Permit Voided I
Parcel Id #
0100600000
Permit Fees
Sanitary Sewer
Storm Sewer
Water Service
Date 06/08/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 55 KNAPP ST
Agent/Owner
OSHKOSH
WI 54902 - 3448 Telephone Number 233-1595
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.