Loading...
HomeMy WebLinkAbout0125237-Plumbing (RPZ valve) CITY OF OSHKOSH No 125237 PLUMBING PERMIT - APPLICATION AND RECORD Owner CITY CENTER ASSOCIATES LLC Create Date 06/08/2007 Plan Contractor D.R. HANSEN PLBG. Category 440 - Industrial-Interior . OSHKOSH ON THE WATER Job Address 250 CITY CENTER Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Shamp Sink Flr/Wst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install RPZ valve on water supply to humidifier****Debit Account of Work Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Size Material Type # Conn. Type $250.00 Plan Approval $0.00 $25.00 0 Permit Voided I Parcel Id # 0100600000 Permit Fees Sanitary Sewer Storm Sewer Water Service Date 06/08/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 55 KNAPP ST Agent/Owner OSHKOSH WI 54902 - 3448 Telephone Number 233-1595 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.