Loading...
HomeMy WebLinkAbout0125245-Building e OSHKOSH ON THE WATER Job Address 232 W 12TH AVE CITY OF OSHKOSH No 125245 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES G/L1NDA S FOURNIER Create Date 06/08/2007 Designer Contractor OWNER Category 161 - Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI Razing the existing house' the garage will remain and become part of a lot combination with 236 W 12th Ave. The sewer and of Work ",ater shall be properly abandoned by a licensed plumber. Plumbing Contractor UNKNOWN HV AC Contractor Electric Contractor $500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Fees: Valuation Issued By: cw Date 06/08/2007 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 0901200000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec e any necessary appro Is before starting such activity. . ~ Date ^' (I)-R~OI Signature Address 236 W 12TH AVE OSHKOSH WI 54902 - 6418 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.