HomeMy WebLinkAbout2007-Building (2)
G
OSHKOSH
ON THE WATER
Job Address 1213 WITZEL AVE
CITY OF No 125162
Fence
o Raze
BUILDING PERMIT - APP ICATION AND RECORD
Owner JASON Create Date 06/05/2007
Designer
Contractor 0
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
Other
Occupancy Permit Not Required
Occupancy Fee
$0.00
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature FRllnstalling vinyl siding on the house and garage, gutting the interi r of the house except for the kitchen (new insulation and drywall),
of Work nd installing 10 replacement windows (same size and location). NO E: A licensed plumber and electrician will be required to obtain the
echanical permits.
HV AC Contractor
lumbing Contractor WATTERS PLUMBING
Fees: Valuation
Issued By: k~ c-
$15,000.00 Plan Approval
$118.00 Park Dedication
$0.00
Electric Contractor UNKNOWN????
Date 06/05/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0607840000
In the performance of this work I agree to perform all work pursuant to rules go erning the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions 0 which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature. (2
Address 257 W 18TH AVE
Agent/Owner
OSHKOSH
Daty:? 6~- ),.n
~.
WI 54902 - 5658 Telephone Number
To schedule inspections please call the Inspection Request line at 36-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building i Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business da s from the time the project is ready.