Loading...
HomeMy WebLinkAbout0125169-Plumbing (water heater & tub) o OSHKOSH ON THE WATER Job Address 1271 WISCONSIN ST Contractor TRADER PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APF L1CATION AND RECORD No 125169 Owner JOANN INDT Create Date 06/05/2007 Category 411 -I esidential-Water Heaters Plan Bathtub 1 Shower Water Softner Wait. t. Shamp Sink Coffee Maker - - - - - - Whirlpool Floor Drain Local Waste - Ice Ch st FlrlWst Sink Int Grease Trap - - - - - Lavatory Lndry Tray Clothes Wshr Exam ~ink Catch Basin Ext Grease Trap - - - - - - Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve - - - - - - Res. Sink Dishwasher Beer Tap Hand ~ ink Urinal Eye Wash Statn - - - - - - Bar Sink Sump Pump Lab Sink Plaste Sink Standp Rec Wtr Sewer Mtrs - - - - - - Water Heater 1 Classrm Sink Sterilizer Surge( ns Sink Ice Maker Deduct Meters - - - - - - Site Drain Breakrm Sink DipWeU F Prep Sink Gar Drain Wtr Usage Mtrs - - - - - - Roof Drain Ejector/Grind Drink Ftn Serv S nk Soda Disp - - - - - Misc. Fixtures - Use/Nature Install power vented water heater and code legal spout on 2nd floor tup. of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1210350000 Valuation $1,200.00 Plan Approval $0.00 Permit Fees / $25.00 0 Permit Voided I Issued By Date 06/05/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of w ich it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges th permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such a~tivity. Signature Date Agent/Owner Address 500 APPLETON ST MENASHA WI! 4952 - 0000 Telephone Number 920-858-4360 BRIAI t-- To schedule inspections please call the Inspection Request line at 1136.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business da)(s from the time the project is ready.